- All windows were replaced on the main floor and the basement in 2019. (Invoice available) - Asbestos-containing vermiculate has been safely removed using a new insulation spray cellulose fibre in 2016. (Invoice available) - A new electrical heating and cooling system (Furnace) has been installed, and the oil tank was removed in 2018. (Invoice available) -A pre-sale inspection has been done, and the report has been conducted. - The asbestos and air quality test has been completed. (Report available)