Well maintenance building. Roof was done in 2023 with 10 year guarantee can be transferred, side wall brick was changed in 2010; back yard balcony were changed in 2013, #4 hot water tank was changed in 2022; #4 was changed in 2021; hard wood floor for apt.1 , apt.2 , apt. 3, apt.4 , apt. 6 , apt.7 and apt.8, The kitchens of apt. 4 apt.6 apt.8 are ceramic counter. Apt. 8 has new bathtub. Good location with 5 minutes walk to Metro, 10 minutes walk to Marcher Jean Talon and Place Saint Hubert, Jean Talon Metro.